ICH menu

=

Home & latest news

=

Africa

=

Asia

=

LAC

=

International

About us

=

About us

Statutes • Codes • Meet the staff • ICH Board of Directors •Annual Reports

=

MEMBERS

Members overview

=

Contact us

Course • Membership

APPLY FOR ICH COURSE

ICH Online Course portal

MEMBERSHIP APPLICATION

Online application form

ICH e-learning

ICH online course platform

HMV Ingenieros

by | Sep 2, 2021 | H, Members

Integral development of Generation, Transmission, Distribution, and Commercialization of Electrical Energy projects
“Turnkey” solutions that include project engineering, procurement, construction, erection, and commissioning for hydro generation projects, including feasibility studies, economic and financial assessments, for transmission line projects, with voltage levels from 44 kV through of 500 kV, and for conventional and Gas Insulated substations ranging from 44 kV up to 500 kV, applying the latest standards for both ANSI and IEC

Control and treatment of hydric resources

Planning, designs, and supervision of infrastructure for ground, river and ocean transportation

Basic and detailed engineering, and technical assistance for projects in the oil, gas, petrochemical, paper, cement, coal, and mining sectors, as well as for “balance of plant” systems of the thermal power generation projects

Environmental studies for hydroelectric power plants, transmission lines, substations, aqueducts and sewage systems, roads, land preparation, mines, and industrial project

Design, specifications, supervision, field testing and commissioning of telecommunications systems for high and extra-high voltage substations, including solutions with fiber optics, PLC, radio, and microwave.
Example projects
Design of Aguadulce Port – Buenaventura – Colombia
Wallerfield 132/66/12 kV Substation – Trinidad & Tobago
Treatment plant of residual water PTAR – Medellín Colombia
San Carlos – San Marcos Interconnection 500 kV Colombia
La Miel Hydroelectric Power Plant Cundinamarca – Colombia
La Cascada 2,3 MW Hydroelectric Power Plant Antioquia – Colombia
Wallerfield – Pinto Road transmission line – Trinidad & Tobago
Wallerfield – San Rafael transmission line – Trinidad & Tobago
More projects in web site  http://www.h-mv.com/

Recent news

Home  |  News  |  Africa  |  Asia  |  LAC  |  International

Securing Hydropower Asset Integrity De-Risks the Investment

  Welcome to the Global Capacity Building Framework 2026. Backed by ICH’s 30-year international legacy and supported directly by the Norad framework, Phase I delivers an elite, executive-level ecosystem engineered to align world-class engineering with global...

ICH Annual Report 2025

The 2025 Annual Report is now available! View it here: T1027788_ICH Annual Report 2025 HRfv  

Reservoir Sediment Management for Sustainable Hydropower in Africa

Reservoir sedimentation continues to affect hydropower performance across Africa, reducing storage capacity, increasing maintenance needs, and impacting long-term asset reliability. 27 - 31 July 2026, Mozambique A training program for professionals working in...

Modeling Integrated Power Markets – Africa

Building practical skills for Africa’s evolving power markets As African power pools and national utilities move toward more coordinated and market-based operation, the need for in-house analytical capability continues to grow. This hands-on course combines power...